Civil, Structural Engineering and BuildingMechanical, Electrical and Powersignalling projectsPermanent WayFaçade SolutionsLabour Supply

Who we are

Global Rail Construction Ltd is a Principal Contractor and a leading UK provider of design and build services to clients in the rail and transportation sector.

News Stories

Feltham to Woking 3&4
12 Sep 2023

Successful commissioning of Feltham to Wokingham Phases 3&4

Following 18 months of efficient planning and effective delivery, Global Rail Construction Limited (GRCL) has supported client and Principal Contractor Atkins, with the successful commissioning of Feltham to Wokingham Phases 3&4. The sheer scale of this achievement can be seen in the blockade numbers: GRCL deployed 64No RRV’s, 32No MEWP’s and 24No Scrap Train Shifts. In total 1,356 staff supported the blockade across 17 miles of track, downloads from step counters were in the region of 12-14 kilometres per day – an incredible effort!!

GRCL’s significant rail systems sub-contract, encompassed Civil and Structural Engineering including temporary works, E&P, Telecoms and Signalling installation works on Network Rail’s Wessex Route – part of their Southern Region. All existing lineside signalling infrastructure has been replaced with new equipment including all cabling, Location Case suites, Signal Structures. AWS and TPWS, and existing AC track circuit train detection replaced by the Frauscher Advanced Counter (FAdC) Axle Counter system. A total of 7No controlled Level Crossings have been renewed to interface with the new ElectroLogIXS lineside equipment with the decommissioning and replacement of the booms, barrier machines, road traffic lights (RTLs), and changing from incandescent bulbs to white light LEDs. This included all road re-surfacing works including yellow and white lining. Our pre-commissioning works enabled our teams to cover multiple sites over the two-week blockade closure of some the busiest lines in the region, including the full telecoms Installation works resulting in a total of 88 SPT’s and 12 Substation phones entered in service.

Our GRCL team has consistently demonstrated a collaborative approach throughout this sizeable multi-disciplinary project. Led by Project Manager Barry Smith, the entire workforce including our supply chain partners, deserve huge praise for the impressive result, resulting in timely culmination and successful commissioning of these newly signalled areas.

Global Infastructure Group
Global Rail Construction
Units 18 & 20
The io Centre
Hearle Way
Hatfield
Hertfordshire, AL10 9EW
+44 (0) 870 990 4074
Registered in England 04272798
ISO 9001ISO 14001ISO45001ROSPAssipNICEICCyber Essentials