Global Rail Construction Ltd is a Principal Contractor and a leading UK provider of design and build services to clients in the rail and transportation sector.
Global Rail Construction were selected by Kier as E&P contractor for the installation of the new 650v power supplies and also the 400v power domestic supplies for the Balcombe to Copyhold Signalling Supply upgrade project on Network Rail’s VTB lines.
Having already supported Kier on previous signalling projects, Global Rail Construction were seen as the partner of choice once more, particularly as the works involved substation access, calling upon the experienced in-house Level C staff that the business have.
The project on Network Rail’s Sussex route involved three sites at Balcombe Tunnel, Ouse Valley and Haywards Heath and required a fully managed delivery solution from Global Rail Construction’s in-house E&P division.
The project relied heavily on close co-operation between Kier’s own teams and those of Global Rail Construction and it is this in-house experience in signalling and civil engineering, that provided Kier with the confidence that the E&P team fully understood the interdisciplinary nature of the works.
The programme was fast track with the power build and install having to be completed in 3 months, however, Global Rail Construction’s E&P team – who are just at home delivering standalone projects under their Principal Contractors Licence – were able to call upon their experience in-house project delivery processes to provide a robust cost loaded programme of activities that could be accurately monitored.